Vector Road Construction with Grader Stock Vector - 26056306
http://www.123rf.com, illustrator dashadima
  • Road Closure Location: Coronation Road, between Highway 7 and Columbus Road
  • Time Line: April 16 2014 to July 15 2015
  • Details: Coronation Road between Highway 7 and Columbus Road traffic will be closed to through traffic for the period indicted above. This is necessary to facilitate construction of the new highway through this area. Proper sign-age and traffic control will be in place to guide traffic safely thorough the work area. 
  • Contact: 407 East Development Group at 1-855-463-3109:
  • Website… www.407.eastphase1.caContact

source: Whitby This Week, April 9 2014 Edition

 

Please feel free to comment on our posts:

This site uses Akismet to reduce spam. Learn how your comment data is processed.